For Everyone Who Wants to Get Involved With , Here is the Moment of Truth. I Know We Just Had an Election, But Here's a Chance to Make a Unified Decision That Actually Matters and CAN Make a Difference. This is the Official GoFundMe Page. I Do Hate to Give Away 5% to a Corporation, But We Are Running Out of Time and Avenues to Do What Needs to Be Done. Below, Please Find the Complete Quote for Materials and Labor Required to Complete the First Repatriation Compound in Ghana. You May Be Very Surprised By the Minuscule Amount of Money Actually Needed to Bring This About.... Literally About 12 Cents From Every African American Would Build This Compound. Realistically Though, We Aren't Going to Get 39 Million Donors, So It May Take a Little More Than 12 Cents From a Lot Fewer of Us. But In Any Event, Here is What We Need:
MATERIALS
1. Cement 1580bags = ghc 55,300.00
2. Blocks 7500pcs = 20750.0
3. Sand 22cubic = 5trips ghc 4,500.00
4. Stones 22cubic = 5trips ghc 10,000.00
5. Robber 2 coil ghc 1,500.00
6. 16mm rod 400pcs - ghc 13,200.00
7. 12mm rod 1200 PCs - ghc 21,000.00
8. 8mm rod 150pcs - 1,000.00
10. Binding wire 8 roll - 500.00
11. Nails 3" n 4" 18 box's - ghc 1,000.00
12. Board 200pcs -ghc 8,000.00
13. 2 x 4 - 150pcs ghc 4,000.00
13. Ply wood 300pcs - ghc 15,000.00
14.Plumbing materials ghc 12,000.00
15. Tile's materials ghc 40,000.00
16. Roof work ghc 30,000.00
Over total for all the materials Ghc 238,250.00
Workmanship
STAGE 1 from foundation to mass concrete
1. Profile ghc 1,000.00
2. Digging of foundation ghc 3,500.00
3. Columns digging ghc 1,000.00
4. Sitting out of pillars ghc 1,000.00
5. Foundation bed concrete - ghc 2,000.00
6. Block laying ghc 3000.00
7. Footing pillars casting ghc 800.00
8. Filling ghc 3,000.00
9. Compactor machine and water ghc 2,000.00
10. Mass concrete ghc 2,500.00
19,800GH Stage 1
STAGE 2
From mass concrete to lintel
1. Block laying ghc 5,500.00
2. Pillars casting ghc 1,200.00
3. Steel bender ghc 1,500.00
4. Carpentry work ghc 1,500.00
9700GH Stage 2
STAGE 3
Slab work
1. Steel work ghc 3,000.00
2. Carpentry work ghc 2,500.00
3. Plumbing works ghc 1,500.00
4. Slab ( concrete casting) ghc 4,500.00
11,500GH Stage 3
STATE 4
From slab level to roof level
1. Block laying ghc 5,500.00
2. Pillars casting ghc 1,500.00
3. Lintel casting ghc 2,500.00
4. Carpentry work 1,300.00
5. Steel work ghc 1,300.00
12,100GH Stage 4
STAGE 5
Finishing
1. Plastering ghc 35,00.00
2. Ceiling work with it materials ghc 9,000.00
3. Bathroom , sink n shower ghc 25,000.00
4. Painting with it materials ghc 15,000.00
5. Septic tank ghc 10,000.00
94,000GH Stage 5 Completion
Building Total All Materials and Labor: 385,350GH
Each Building Contains 1 4Bdrm, 3Bdrm, 2Bdrm, and 1Bdrm Unit. Total of 25 Buildings. Total of 100 Family Units.
385,350GH x 25 = 9,633,750GH = $2,419,020.72USD
www.gofundme.com/ProjectREPATRIATE
My Name is Nana Jovaun Kwame. I Am From Milwaukee, Wisconsin In 2012 When I Was 25 Years Old, I Moved to Ghana, West Africa. I Used to Think That I Had "Accomplished" Many Dreams/Goals in My Life. But How Many of Them Have Actually Been MY OWN Dreams/Goals? Not Something That I Was Programmed to...