10/17/2025
Was a big day two on site for the Catalpa treehouse! Early morning load-out getting all of the wall sections, roof sections, platform, and spiral stair on the trailer in Fort Collins. By the end of the day we got the main platform up, braces in, all 4 walls set, landing platform decked, and spiral stair set! The wall sections were heavier than expected with the bump-outs left on each wall, but once we got them over next to the treehouse lifting them up was easy with the GRCS winch and pulley rigged up higher in the tree.