
08/21/2025
Poured footings for wrap-around porch deck:
Dug by hand to height- 11each18"×4' deep holes for 16" concrete form tubes.
Hauled in my truck, carry, mix and pour 140 bags total, at 60 # each for a total of 8,400 #,
Tie 20 each 1/2"×10' RE-bar into footing reinforcements.
3"+ rain damaged 7 of the 11 tubes, holes needed cleaned out and new tubes.