Les Petits Quintin

Les Petits Quintin A beautiful perigordian French house available to rent throughout the year. Situated near Bergerac in the Dordogne it is close to local shops and bars etc

Les Petits Quintin is a large stone manor house situated in the Dordogne, France within half and hours drive from Bergerac airport. It is set within 4 acres of grounds and boasts stunning views across the countryside. The house is currently undergoing restoration. This work started in November 2015 and is due to be complete in late Spring 2016. The front wall has been re-built as it had suffered f

rom subsidence and now matches the appearance of the rest of the stone walls. All of the windows and doors to the front elevation have been replaced. Inside the house has been re-wired, a new central heating system installed and new plumbing/drainage added. The accommodation consists of 5 bedrooms. 3 of these have en-suite bathrooms, with the two bedrooms at the front of the property upstairs benefitting from en-suite bathrooms within the two towers. These have roll top slipper baths as well as walk in showers. The remaining two bedrooms are downstairs and share a bathroom. Overall the property can accommodate 12 people (8-10 adults) and cots can be provided for babies. The property will be ready for rental for the school summer holidays 2016 - please message or email if you are interested in making a booking or for more information. It is hoped that there may be some weeks available from June, but watch this space for updates on the progress of the renovations. The property will also be available for short breaks in Autumn, Winter and Spring (or a longer Christmas/New Year getaway). We are happy to provide recommendations for restaurants and days out and offer a booking service for these. The nearby (5 mins drive) Chateau des Vigiers golf course is great for keen golfers. There are also lots of footpaths for walking/ cycling/ running. There are plans for a swimming pool at the house watch this space for updates.

Today work started on finishing the drive so we will lose that ‘building site’ look! Today’s progress 😀
11/06/2019

Today work started on finishing the drive so we will lose that ‘building site’ look! Today’s progress 😀

Pool progress. It’s a beautiful sunny morning and there has been lots of progress with the pool. Next week (weather perm...
29/03/2019

Pool progress. It’s a beautiful sunny morning and there has been lots of progress with the pool. Next week (weather permitting), the liner is due to be installed and the terrace areas concreted 😎

Some more progress inside the house- spare room bathroom floor re-sanded and finished by Doug 😀
01/02/2019

Some more progress inside the house- spare room bathroom floor re-sanded and finished by Doug 😀

After almost two weeks of chaos, the bulk of the landscaping has been done, the driveways and parking area are ready to ...
26/01/2019

After almost two weeks of chaos, the bulk of the landscaping has been done, the driveways and parking area are ready to have the stone laid on top, and the base of the pool is in. Doug has started the block work for the base of the outdoor kitchen and weather permitting, the pool block work will start next week. It's all very muddy at the moment, but we will get there.

A bit of progress - new floor and almost finished new roof on what will be the covered seating and dining area next to t...
03/01/2019

A bit of progress - new floor and almost finished new roof on what will be the covered seating and dining area next to the pool (when it’s built). Last few photos taken today in the sun 🌞

Some progress. Doug has finished removing the old render from the west tower, the small bathroom windows upstairs have b...
30/09/2018

Some progress. Doug has finished removing the old render from the west tower, the small bathroom windows upstairs have been restored and painted, and he’s built new shutters. It’s all ready for the stone to be pointed 😀

Two years ago this is how the house looked!
15/12/2017

Two years ago this is how the house looked!

They've only gone and knocked the front wall down

Some more progress outside
05/08/2017

Some more progress outside

Doug has taken the old crépi off the towers and has started to point the stone.
24/06/2017

Doug has taken the old crépi off the towers and has started to point the stone.

15/12/2016

A text arrived this afternoon from our electrician saying that yesterday all the work was finished. Hallelujah! It's only been 14 months! That means it is now up to us to finish off the last bits and the inside of the house will be done 😀

A bit of a progress update - more rooms that are almost finished.
06/11/2016

A bit of a progress update - more rooms that are almost finished.

Adresse

Lieu-dit Petit Quintin
Monestier
24240

Site Web

Notifications

Soyez le premier à savoir et laissez-nous vous envoyer un courriel lorsque Les Petits Quintin publie des nouvelles et des promotions. Votre adresse e-mail ne sera pas utilisée à d'autres fins, et vous pouvez vous désabonner à tout moment.

Contacter L'entreprise

Envoyer un message à Les Petits Quintin:

Partager