28/03/2026
A double garage stripped of the asbestos sheeting, disposed in a proper manner, remove all timber joists on the one garage, fit new timber joists & purlins, fit 2mm thick aluminium central valley gutter welded up, fitted along with the down pipe & then 40mm thick composite panel sheeting fitted, white pvc capping & flat board at the front of the garage & fabricated flashings fitted to finish to a high standard.
Now a new pvc window & door & away to get the other window done as well as the customer is that happy with it.