04/17/2025
-- ๐ญ๐๐๐ ๐ท๐๐๐๐ซ๐ถ๐ป --
๐ฅ๐ฎ๐บ๐ฝ ๐๐น๐ผ๐๐๐ฟ๐ฒ๐ ๐๐ผ๐ป๐๐ถ๐ป๐๐ฒ ๐ฎ๐ ๐-๐ด๐ฌ/๐ฅ๐ผ๐๐๐ฒ ๐ฐ๐ฎ ๐๐ป๐๐ฒ๐ฟ๐ฐ๐ต๐ฎ๐ป๐ด๐ฒ ๐ถ๐ป ๐๐ฒ๐บ๐น๐ผ๐ฐ๐ธ ๐ง๐ผ๐๐ป๐๐ต๐ถ๐ฝ, ๐๐ผ๐น๐๐บ๐ฏ๐ถ๐ฎ ๐๐ผ๐๐ป๐๐
Motorists are advised that overnight ramp closures continue on Interstate 80 at Exit 232 (Route 42 / Buckhorn) in Hemlock Township, Columbia County. This project is part of a multi-year reconstruction and resurfacing project on Interstate 80 in Columbia County.
On Thursday, April 17, 2025, the contractor will continue work on the entrance and exit ramps at the Interstate 80 / Route 42 interchange (Exit 232 / Buckhorn). Motorists can expect the below closures.
๐ง๐ฟ๐ฎ๐ณ๐ณ๐ถ๐ฐ ๐๐บ๐ฝ๐ฎ๐ฐ๐๐
โข Interstate 80 west exit ramp to Route 42 will be closed.
o A detour using Exit 236 (Route 487/Bloomsburg), Route 487 south (Lightstreet Road), Route 11 south (Main Street) in the Town of Bloomsburg, Route 42 north, will be in place.
โข Interstate 80 west entrance ramp from Route 42 north will be closed.
o A detour using Interstate 80 east, Exit 236 (Route 487/Bloomsburg), Interstate 80 west, will be in place.
Work includes milling of the interchange ramps, paving, and line painting. Work will be performed between the hours of 7:00 PM and 6:00 AM.
Motorists should be alert, slow down, expect delays in travel, watch for stopped or slow-moving vehicle, and drive with caution.
New Enterprise Stone and Lime Co., Inc. is the prime contractor for this $11.1 million reconstruction and resurfacing project. Work includes shoulder reconstruction, roadway resurfacing, structure preservation, signing, and other miscellaneous work. Work on this project is anticipated to be completed in June of 2025.