04/19/2026
We’ve been working very hard getting the deck ready for rental season. We removed all of the old vertical 2”x2” wood spindles (that no one wanted to stain). It was recently power washed and then stained with Sherwin Williams’ “Cabin Brown” Deck and Dock stain.
Thank you to our friends, Marlin and Becky McCauley, for helping us update the look with a horizontal cabling system that required 47,563 screws. Becky was a trooper and helped me plant flowers and veggies in the garden and then we tackled the assembly of two Polywood lounge chairs.
It was a gorgeous weekend and it was even better with friends!